CONQUEST® Flangeless Piping
Space Considerations for Field Installation Equipment
During the design stages of a system using CONQUEST flangeless piping,
consideration must be given to the vertical, horizontal, and lateral
space clearances needed for field installation equipment, whether
the project is new or retrofit construction.
The illustration at right demonstrates the dimensional clearances
needed. These dimensions are measured from the centerline of the
butt-weld with the pipe in the fusion welding equipment.
|
|
Equipment Clearances |
| Dimension |
Clearance Needed inches (mm) |
| A |
24 (610) |
| B |
11 (279) |
| C |
10 (254) |
| D |
10 (254) |
| E |
7 (180) |
| F |
17 (432) |
|
 |