Crane Home
  Home  |  About Us  |  Contact Us  |  My Account  |  Terms and Conditions  |  Careers  |  Links  |  Email Translator  |  
Translate!


  Product Families
  Product Dimensions
  Spec Assistance
  Ask the Pipe Doctor
  Liner Types
  Chem. Resistance
  CONQUEST®
  Product Specs
  Special Applications
  Tech Library
  Tools & Fabrication
  Inst. & Maintenance
  US/Global Sales   Contacts
  FAQ
  Design Manual






CONQUEST® Flangeless Piping
Space Considerations for Field Installation Equipment

During the design stages of a system using CONQUEST flangeless piping, consideration must be given to the vertical, horizontal, and lateral space clearances needed for field installation equipment, whether the project is new or retrofit construction.

The illustration at right demonstrates the dimensional clearances needed. These dimensions are measured from the centerline of the butt-weld with the pipe in the fusion welding equipment.

Equipment Clearances
Dimension Clearance Needed
inches (mm)
A 24 (610)
B 11 (279)
C 10 (254)
D 10 (254)
E 7 (180)
F 17 (432)


"This page is a machine translation of the source page, which is written in
English. This translation is intended to provide a general idea of the
page's content, and is not guaranteed for accuracy."